Comer Health And Rehabilitation
Staffing Hours & Turnover
Payroll-based CMS staffing hours and annual turnover.
Care Quality & Operator Scorecard
Post-hospital rehab vs. long-term resident quality measures.
Tailored Tour Checklist
Generated from official CMS inspection history- Recent inspections flagged infection control. How do you monitor hand hygiene, isolation protocols, and outbreak notifications for families?
- Inspections noted medication management issues. How are prescriptions double-checked during shift changes and hospital discharges?
- Food safety or nutrition appeared on a recent inspection. Can we tour the dining area during a meal and review how special diets are tracked?
- Fall prevention or environmental hazards appeared in recent records. What is your fall-prevention plan and average call-light response time at night?
- What is the typical nurse and aide turnover rate here over the past 12 months?
- How quickly are families notified if a resident's condition or medication changes?
Official CMS Health Inspection Violations (11)
Chronological surveyor citations graded A (minimal) through L (Immediate Jeopardy).
Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs.
Provide and implement an infection prevention and control program.
Ensure food and drink is palatable, attractive, and at a safe and appetizing temperature.
Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured.
Provide care and assistance to perform activities of daily living for any resident who is unable.
Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
Provide and implement an infection prevention and control program.
Ensure that each resident is free from the use of physical restraints, unless needed for medical treatment.
Ensure each resident receives an accurate assessment.
Develop the complete care plan within 7 days of the comprehensive assessment; and prepared, reviewed, and revised by a team of health professionals.
Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.